Custom ERP development in Petropavlovsk
We work with companies in Petropavlovsk remotely — nobody has to travel. An ERP is not needed «because the company grew». It is needed when the same data lives in several places and stops matching: the warehouse says one thing, production another, accounting a third, and a person reconciles them at month end.
We scope the estimate before the work starts; timelines and warranty go in the contract.
What the work includes
We start where the losses are
Not the whole ERP at once, but the module losing the most today — usually the warehouse or production.
1C keeps the statutory accounting
We take the operational loop and connect the two with an automatic exchange.
Cost per order
The question the whole project exists for: how much did we earn on this order or this site.
Warehouse from a phone
Receiving, shipping and stocktaking happen at the shelf with scanning, not from memory later at a desk.
Exchange designed for failure
What happens when the other system is unavailable, when a document is deleted, when a packet is delivered twice.
Source code handed over
With documentation and a deployment guide.
How we work with companies in Petropavlovsk
Everything runs remotely: the task is reviewed and the work demonstrated over video, correspondence in messengers, contract and closing documents electronic, payment by bank transfer or Kaspi.
The estimate is given before the start, not after the fact: it is visible what has to be done now and what can wait for the next stage.
Timelines and warranty are fixed in the contract. Clients from other cities are served on exactly the same terms as those in Almaty.
Signs it is time
Procurement in a spreadsheet, warehouse in one program, production in another, sales in a CRM, accounting in 1C — each works, together they do not.
«How much did we earn on this order» requires a person who spends half a day merging five sources.
The buyer cannot see that production reserved the material; production cannot see the order was cancelled.
An annual stocktake produces discrepancies and nobody can reconstruct where they came from.
The modules it is assembled from
Procurement and warehouse: requirement, supplier order, receipt, stock by warehouse and bin, reservations.
Production: specifications, orders, material write-off against actuals, output and cost.
Sales: orders, reservation, shipment, settlements.
Finance: payments, cash movement, margin per order.
Exchange with 1C: statutory accounting there, the operational loop here.
How we run it
- Survey. Where data diverges and which module loses the most.
- Module design. Data structure, exchange with 1C, estimate.
- Development. A working slice every two weeks.
- Module launch. Balance migration, parallel running, training.
- Next module. Estimated after the previous one is live.
Frequently asked
Do you work with companies in Petropavlovsk?
Yes, remotely across Kazakhstan. Discussion and demos over video, documents electronic, no need to travel anywhere.
How much does custom ERP development cost?
From ₸1,500,000 for the first module. The full system is priced module by module.
Will the ERP replace our 1C?
Usually not, and it should not. Statutory accounting stays in 1C, the ERP takes the operational loop, with an automatic exchange between them.
How long does implementation take?
The first module 8-12 weeks. A full rollout stretches over a year, which is why it is done in parts.
Do you build ERPs for construction companies?
Yes. Sites, estimates, material write-off per site and cost per site separately.
Will it work on the warehouse floor from a phone?
Yes. Receiving, shipping and stocktaking with scanning are part of the warehouse module.